Sealing machine precautions.

                                                                                       Sealing machine precautions.

1. It is not suitable for metal containers and metal covers. It is not allowed to press the start button on the metal table, otherwise it will damage the machine.

2. Insert the induction air plug and tighten the screw before turning on the power.

3. Use single-phase three-wire power cord. For operator safety, be sure to use single-phase three-wire power socket. The work floor must be dry to keep insulation.

4, with temperature overheating automatic protection function, when the internal temperature of the machine is overheated, the buzzer sounds in the machine ” abnormal protection (PRO. MD.)” yellow indicator light, at this time should turn off the main power switch, standby cooling After the buzzer stops, continue working.

5. During the working process, always touch the surface of the sensor head to check whether it is overheated. If it is found that the hot hand should stop heating, it should work after cooling (cooling can not turn off the power), when the “WARM UP” green indicator light is off, Do not press the start button to avoid false triggering. When the unit is finished, turn off the power switch on the panel.

6, equipped with a fuse of 5A, not available for greater than 5A insurance instead.

7. There is high voltage inside, the bottom plate is charged, and it is strictly forbidden to repair it personally to avoid personal electric shock.

8. If it is found that there is a bare wire before use, stop using the machine and use it after repair.

9. The equipment should not be impacted, stressed or damp when transported, stored or used.

10. When the product is inspected and checked out, in the case of normal transportation and good packaging, if the parts of the product are found to be inconsistent with the packing list, the company should be contacted in time. 11. According to the instruction manual, the operation should be clearly understood in advance. If the quality of the product is found, the company will be explained to the company within the prescribed time limit. The equipment is guaranteed for half a year and is responsible for maintenance.