91久久国产综合精品女同我,国产激情一区二区三区在线观看,国产精品国产三级国产试看

Trends

News

Trends

Sealing machine precautions.

2018-08-27

                                                                                       Sealing machine precautions.

1. It is not suitable for metal containers and metal covers. It is not allowed to press the start button on the metal table, otherwise it will damage the machine.

2. Insert the induction air plug and tighten the screw before turning on the power.

3. Use single-phase three-wire power cord. For operator safety, be sure to use single-phase three-wire power socket. The work floor must be dry to keep insulation.

4, with temperature overheating automatic protection function, when the internal temperature of the machine is overheated, the buzzer sounds in the machine " abnormal protection (PRO. MD.)" yellow indicator light, at this time should turn off the main power switch, standby cooling After the buzzer stops, continue working.

5. During the working process, always touch the surface of the sensor head to check whether it is overheated. If it is found that the hot hand should stop heating, it should work after cooling (cooling can not turn off the power), when the “WARM UP” green indicator light is off, Do not press the start button to avoid false triggering. When the unit is finished, turn off the power switch on the panel.

6, equipped with a fuse of 5A, not available for greater than 5A insurance instead.

7. There is high voltage inside, the bottom plate is charged, and it is strictly forbidden to repair it personally to avoid personal electric shock.

8. If it is found that there is a bare wire before use, stop using the machine and use it after repair.

9. The equipment should not be impacted, stressed or damp when transported, stored or used.

10. When the product is inspected and checked out, in the case of normal transportation and good packaging, if the parts of the product are found to be inconsistent with the packing list, the company should be contacted in time. 11. According to the instruction manual, the operation should be clearly understood in advance. If the quality of the product is found, the company will be explained to the company within the prescribed time limit. The equipment is guaranteed for half a year and is responsible for maintenance.

        1. <strike id="rl7z2"></strike>

          <strike id="rl7z2"></strike>
          主站蜘蛛池模板: 榆树市| 永清县| 廊坊市| 澎湖县| 台北市| 什邡市| 通许县| 宁武县| 铜鼓县| 阜平县| 梁山县| 安义县| 闸北区| 安徽省| 昌都县| 福鼎市| 彰化县| 沧源| 延川县| 珲春市| 潞城市| 宣恩县| 新兴县| 驻马店市| 泌阳县| 阿尔山市| 宜川县| 岳池县| 诸城市| 申扎县| 弥渡县| 江西省| 阳原县| 浪卡子县| 当涂县| 逊克县| 永吉县| 临泉县| 苍南县| 卓资县| 渭源县|